1) Policy – Waste disposal management shall be taken special note to prevent hospital infection. – Infections wastes shall be managed, stored strictly and burned by […]
Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door
Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door Things Side Loading Door Top Loading Door Suggestion Cost Affordable High expense Manufacture Tech. Easy […]
small incinerators
The incinerator shall be equipped with water injection nozzle connection. If the temperature in the primary chamber should rise too high (normal temperature between 300 […]
animal incinerator for sale
The incinerator shall be provided with a range of interconnecting ductwork between the thermal reactor outlet and the inlet of the chimney. This ductwork shall […]
incinerator manufacturer
“PYROLYTIC” combustion, by controlling the gasification of waste The incinerator manufacturer must avoid the release of black smoke and fine dust, during the loadings. It […]
medical waste furnace
The incinerator to be fully assembled wired and logic function tested in the factory, prior to dispatch. – One high flue gas temperature indicator/alarm […]
Common 10kgs per human resources burner for small health care facility
This equipment quality structural for kinds of site, like hospital, environmental department, animal cremation agencies, etc. HICLOVER Incinerator supply updated models with dual combustion chamber, […]
Family Pet Crematory with Movable system & & & & Auto. Door & & Independent Placement
Incinerator Model A1500, Intro This design is big-scale pet cremation tools for huge pets. Construction is dual/double combustion chamber with 03 units oil/gas burner, batch […]
Pet crematorium as high as 200KG/day
Animal Crematory Burner Ability: Normal 80kgs per feeding Thing Spec Layout A900 Interior Measurements 120 x 90 x 85 CM Match for Family Pet Feline […]
Burning ability 50kg/hr with damp scrubber with dual released heater
This model is small-scale waste incineration equipment for small waste output. Construction is dual/double combustion chamber with 02 units oil/gas burner. Waste feed chamber is […]