High Temperature Waste Incinerator Model D. MB 750XL Burn Rate-150Kg/hour minimum Weight(Kg)-4000kg Secondary Chamber (double chamber with post-burning) Gas Retention Time 2 second Fuel Diesel […]
small home incinerators
Equipment Access Openings: Arrange all equipment and piping to allow access to openings without disassembly of equipment or piping. Provide space which permits full opening […]
small incinarator
heavy Duty Steel casing High Quality refectory lining & insulation 1 x Diesel fired ignition burners operated on / off Front Loading […]
manufacturer of ha zardous waste incinerator in china
Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system Imputing door Mouth Width (mm): 760*760 (approx.) Chimney External Diameter (mm): 300 ± 10 […]
pet crematory
The temperature is over the minimum and under the maximum required temperature (e.g 1150?C) of the thermal reactor (partial load). When switching off, only […]
burner manufacturers
1. SCOPE OF FEATURE The work specified in the agreement will certainly consist of. 1. Supply, place as well as assign a heater as given […]
medical incinerator producer
1. The double chamber incinerator shall ideally be made. Air supply in the primary and secondary chamber shall be controlled in between 30% -80% as […]
laboratory heater
the entire carcass of animals (cattle, steeds, Sheep, pigs, and more), along with normally contaminated materials Products in the gas stove. ? Opening Doors – […]
hog incinerators
The purpose of the start-up burner is to ignite waste materials and to maintain the prescribed minimum temperature in the primary chamber. It shall be […]
clinical incinerators
● Able to drop 25-30kg per hour ● Contain 2 chambers to ensure significant decline in exhaust ● Be capable of temperature degree in series […]